CREATE
  • Technology
    • BIOTECH
    • COMMUNICATIONS
    • COMPUTING
    • IMAGING
    • MATERIALS
    • ROBOTICS
    • SOFTWARE
  • Industry
    • DEFENCE
    • INFRASTRUCTURE
    • INNOVATION
    • MANUFACTURING
    • POLICY
    • PROJECTS
    • TRANSPORT
  • Sustainability
    • ENERGY
    • ENVIRONMENT
    • RESOURCES
  • Community
    • CULTURE
    • PEOPLE
  • Career
    • EDUCATION
    • INSPIRATION
    • LEADERSHIP
    • TRENDS
  • About
    • CONTACT
    • SUBSCRIBE
No Result
View All Result
CREATE
  • Technology
    • BIOTECH
    • COMMUNICATIONS
    • COMPUTING
    • IMAGING
    • MATERIALS
    • ROBOTICS
    • SOFTWARE
  • Industry
    • DEFENCE
    • INFRASTRUCTURE
    • INNOVATION
    • MANUFACTURING
    • POLICY
    • PROJECTS
    • TRANSPORT
  • Sustainability
    • ENERGY
    • ENVIRONMENT
    • RESOURCES
  • Community
    • CULTURE
    • PEOPLE
  • Career
    • EDUCATION
    • INSPIRATION
    • LEADERSHIP
    • TRENDS
  • About
    • CONTACT
    • SUBSCRIBE
No Result
View All Result
CREATE
No Result
View All Result
Home Industry Infrastructure

“Construction is manufacturing”: 7 lessons for industrialising construction

Sarah Slattery by Sarah Slattery
22 October 2026
in Infrastructure, Features
Reading Time: 4 mins read
0
“Construction is manufacturing”: 7 lessons for industrialising construction

Industrialised construction asks engineers to think differently before anything gets built. Image: Getty

The greatest gains from industrialised construction come from creating the conditions that make repeatable production possible.

Sarah Slattery is Director of Partnerships and Innovation at national property and construction advisory firm Slattery.

We don’t think of Australia as a manufacturing nation. But construction is manufacturing.

Conventionally, we treat every new building as a prototype. The construction “factory” moves to each new site and production starts before the design is fully resolved. The industry has spent years trying to think outside the box to improve productivity.

Industrialised construction asks us to look inside the box instead. Thinking inside the box means looking at the whole kit of parts. Once we do, many of the challenges – such as labour shortages and skills gaps – become solvable system design problems.

The seven lessons, at a glance

  1. Industrialised construction is not a single solution.
  2. Standardisation creates the conditions for industrialisation.
  3. Repetition, not the first project, unlocks the value.
  4. Industrialisation needs pipeline certainty.
  5. Industrialisation requires repeatability before scalability.
  6. A shorter program creates more choices.
  7. Modular construction can mean low-carbon, but not always.

The industry has no shortage of terms for building differently: modern methods of construction, prefabrication, modular construction, offsite manufacturing and design for manufacture and assembly, among others. They are often used interchangeably.

The term industrialised construction describes something broader than manufacturing more of a building offsite. It means applying greater standardisation, repeatability and integration across the entire process of design, procurement and delivery.

Case study 1: European modular construction system

Slattery benchmarked traditional in-situ concrete construction in Australia against two overseas industrialised construction approaches.

The first was a European factory-manufactured timber building system. This system produces highly finished, integrated building components – essentially a “kit of parts” – that are transported flat and assembled on site.

“Volumetric modular construction reduced the program by 23 per cent but came with an 8.5 per cent cost premium.”
Sarah Slattery

The second was volumetric modular construction, whereby three-dimensional modules are manufactured and fitted out offsite, then transported and assembled onsite. This means transporting considerably more volume, including the air inside each module. It also introduces transport, logistics and installation considerations.

Both approaches were tested on the same hypothetical mid-rise residential development: basement, ground-floor retail and seven apartment levels, approximately 5,200 m². The analysis accounted for Australian conditions, including the National Construction Code, fire and acoustic requirements, climate, supply chains and labour markets.

The factory-manufactured timber system cost 3.8 per cent less than traditional construction and reduced the program by 43 per cent.

Volumetric modular construction reduced the program by 23 per cent but came with an 8.5 per cent cost premium.

In other words, one method delivered both cost and time benefits; the other traded higher cost for time.

Cost and program against traditional construction

In the graphs below, bars left of the baseline mean lower cost or a shorter program. The timber system reduces program time by 43 per cent and cost by 3.8 per cent.

Meanwhile, volumetric modular reduces program time by 23 per cent and adds 8.5 per cent to cost.

Case study 2: Australian modular schools program model

Slattery tested how the economics of permanent modular construction could change across a program of repeat school projects for a state education agency.

We compared traditional delivery with an initial modular project and a mature modular program, assuming a standardised “kit-of-parts” design library that could be reused across successive projects. This captured the higher setup costs of early adoption, then tested how repetition could reduce design effort, consultant fees, preliminaries and construction costs as the program matured.

We estimated that the first modular project would cost 7.4 per cent more than traditional delivery, reflecting upfront design development, factory setup, learning-curve inefficiencies and limited market competition.

“The greatest gains from industrialised construction … come from creating the conditions that make repeatable production possible.”
Sarah Slattery

By the fifth repeat project, total project cost was estimated to be 11 per cent below the traditional baseline.

Facility construction costs fell by approximately 27 per cent between the first and fifth modular projects, as repetition improved design reuse, procurement and factory production.

Repetition drives value across the program

The first project typically costs more than traditional delivery:

versus traditional baseline
+ 0 %

Whereas later projects are less expensive than traditional delivery:

versus traditional baseline
- 0 %

This amounts to a reduction in total project cost between build one and build five of 17 per cent.

Case study 3: United States failed factory model

Founded in 2015, Katerra set out to industrialise construction by vertically integrating the entire delivery process. Backed by more than $2.9 billion, the company promised to reduce construction programs by 30–50 per cent.

Katerra sought to implement modern technology at every stage of delivery, from architectural design and engineering to manufacturing, procurement, construction and project management. It even developed its own software platform and manufactured building products ranging from windows to heating, ventilation and air conditioning systems.

At its peak, Katerra employed 7500 people and operated an assembly factory in Phoenix, Arizona. The company also opened a 25,000 m2 cross-laminated timber (CLT) manufacturing facility in Spokane, Washington, increasing North American CLT production capacity by 50 per cent.

However, rapid expansion across multiple products, services and markets increased complexity faster than Katerra could standardise and integrate its operations. Katerra filed for bankruptcy in 2021.

Katerra attempted to apply a Silicon Valley disruption model but underestimated just how variable the construction industry is. The real opportunity for industrialisation is in focusing on the elements that can be standardised and repeated at scale, not in trying to industrialise everything at once.

Repeatable processes

Industrialised construction asks engineers to think differently before anything gets built.

The greatest gains from industrialised construction do not come from taking construction offsite and making buildings in boxes. Instead, they come from creating the conditions that make repeatable production possible.

Read Slattery’s full report on industrialising construction.

Tags: Australian constructionproductivity
Previous Post

Can Australia build pharmaceutical resilience before the next supply chain shock?

Next Post

Katherine Richards: Five years on, the biggest risk to AUKUS is the skilled workforce required

Sarah Slattery

Sarah Slattery

Related Posts

“Investing in capacity building”: Senator Murray Watt on data centre growth
Computing

“Investing in capacity building”: Senator Murray Watt on data centre growth

19 November 2026
Why Geelong’s century-old Barwon River aqueduct is worth saving
Features

Why Geelong’s century-old Barwon River aqueduct is worth saving

19 November 2026
Robotics

WATCH: The robots lifting solar panels so humans don’t have to

19 November 2026
Next Post
Katherine Richards: Five years on, the biggest risk to AUKUS is the skilled workforce required

Katherine Richards: Five years on, the biggest risk to AUKUS is the skilled workforce required

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

create is brought to you by Engineers Australia, Australia's national body for engineers and the voice of more than 120,000 members. Backing today's problem-solvers so they can shape a better tomorrow.
  • ABOUT US
  • CONTACT US
  • SITEMAP
  • PRIVACY POLICY
  • TERMS
  • SUBSCRIBE

© 2024 Engineers Australia

No Result
View All Result
  • Technology
    • BIOTECH
    • COMMUNICATIONS
    • COMPUTING
    • IMAGING
    • MATERIALS
    • ROBOTICS
    • SOFTWARE
  • Industry
    • DEFENCE
    • INFRASTRUCTURE
    • INNOVATION
    • MANUFACTURING
    • POLICY
    • PROJECTS
    • TRANSPORT
  • Sustainability
    • ENERGY
    • ENVIRONMENT
    • RESOURCES
  • Community
    • CULTURE
    • PEOPLE
  • Career
    • EDUCATION
    • INSPIRATION
    • LEADERSHIP
    • TRENDS
  • About
    • CONTACT
    • SUBSCRIBE