Inside the Poatina Buffer Dam
The Northern Midlands Irrigation Scheme is providing new, highly reliable water to 50 Tasmanian irrigators.
The Northern Midlands Irrigation Scheme is providing new, highly reliable water to 50 Tasmanian irrigators.
An icon of Tasmanian engineering heritage, the Duck Reach Power Station was designed to harness the hydro-electric power generated by ...
Jo Fisher CPEng, Director, Howarth Fisher and Associates. Jo Fisher’s geography studies — and her career — took a different ...
When Tasmania’s tallest and most remote wind farm came online, it took the state to 100 per cent renewable energy.
A Tasmanian engineering firm has turned from manufacturing stills and vats for whisky to making the the spirit that sits ...